  • Owner Permission Received 8/1/18

  • Sent personal note, letter or email to your contacts to thank those who helped you obtain the building or other project information (include owner) 8/30/18

  • Mailed AE Dept. Thank You Letters to primary contacts   8/30/18

  • Obtained Project Documentation (drawings, specs, etc.)   8/30/18

  • Turned in Project Initiation Checklist Part 1   8/20/18

  • Turned in Project Initiation Checklist Part 2  8/27/18

  • Confirmed and/or Corrected Master List Information 8/30/18

  • Structural Existing Conditions Report 9/12/18

  • Tech Report 1 Uploaded 10/15/18

  • Tech Report 2 Uploaded 10/20/18

  • Building Statistics 2 Uploaded 10/24/18

  • Tech Report 3 Uploaded 12/1/18

  • Existing Conditions Updated 12/7/18

  • Abstract Uploaded 12/7/18

  • Proposal Uploaded 12/10//12

  • Final Presentation Uploaded 4/28/19

  • Facebook - White Circle
  • Pinterest - White Circle
  • Instagram - White Circle

© 2023 by Jade&Andy. Proudly created with Wix.com

  • Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Christopher Ankeny. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

bottom of page