Building A Robert Dawson | Structural
State College, PA Dr. Linda Hanagan
Owner: HFL Corporation
Architect: Penn Tera Engineering
Builder: Leonard S. Fiore
No. of Stories:7 above grade, 2 below
Occupancy Type: Mixed Use/Student Housing
Cost: $21,764,000
Structural
-
Hollow-core plank on block
-
Transfer slab between parking garage and residential spaces
-
Concrete frame
CM
-
Design – Bid – Build
-
2-year timeline
-
September 2018 August 2022
-
Demo site before construction
MEP
-
Ptac AC units in each apartment
-
Efficient Lighting
News Feed
-
Owner Permission Received 8/1/18
-
Sent personal note, letter or email to your contacts to thank those who helped you obtain the building or other project information (include owner) 8/30/18
-
Mailed AE Dept. Thank You Letters to primary contacts 8/30/18
-
Obtained Project Documentation (drawings, specs, etc.) 8/30/18
-
Turned in Project Initiation Checklist Part 1 8/20/18
-
Turned in Project Initiation Checklist Part 2 8/27/18
-
Confirmed and/or Corrected Master List Information 8/30/18
-
Structural Existing Conditions Report 9/12/18
-
Tech Report 1 Uploaded 10/15/18
-
Tech Report 2 Uploaded 10/20/18
-
Building Statistics 2 Uploaded 10/24/18
-
Tech Report 3 Uploaded 12/1/18
-
Existing Conditions Updated 12/7/18
-
Abstract Uploaded 12/7/18
-
Proposal Uploaded 12/10//12
-
Final Presentation Uploaded 4/28/19